Articles Articles Most Popular Articles Most Popular Articles Most Helpful Topics Most Helpful Topics Login Login
  PrintPrint Current Article/Category and All Sub-Articles/Categories
 
How do I wire and set up ZSS10-NOZ and ZSS10 –GOZ switches in a 3 way on the Lumina Gateway 2.0?

How do I wire and set up ZSS10-NOZ and ZSS10 –GOZ switches in a 3 way on the Lumina Gateway 2.0?


ZSS10-NOZ is wired to a Hot and a Neutral (A NEUTRAL IS REQUIRED) Can be wired to the load or as an auxiliary.

 ZSS10-GOZ can be wired to the load as a single pole, and CANNOT be used as an auxiliary, because it has no neutral.

 The switches must be set up in this order:

1.) You must first enroll switches in the Gateway via lcs.leviton.com

2.) Then update the firmware on all switches

3.) Then follow install instructions for pairing switches

Identify the first switch and when you enter the 60 second identify stage

Go to the switch you want to pair it with and start pairing procedure on the switch you are pairing it with.

When complete, go back and identify the switch that was paired and pair the switch that was identified.

 



Article ID: 1432